Skip to main content
Guides16 Sep 2026

What to prepare before a survey of your gates and bike park

The most useful survey happens at peak time, at the gate and bike park that actually jam. A checklist to prepare in advance, and what MSTAR engineers will measure.

Written by MSTAR deployment team4 min read Illustrative data

The survey tells engineers which equipment can be reused, how many lanes are needed, where the controllers go and which gate to pilot. A survey at a quiet time only shows the layout; a survey at peak time shows the problem.

Six things to have ready

  • A plan of the gates, the bike park and the doors to control, with a photo of each spot
  • People through the gate and vehicles into the bike park per shift; shift start or school start times
  • The equipment in use: card readers, controllers, gates, barriers, cameras, recorders, with brand and model
  • The type of card issued to staff or students
  • The current procedure for a lost card, a visitor, a vehicle whose exit does not match
  • Who will use the software: guards, reception, HR, IT; the time and attendance or HR software in use

If you can, count the busiest 5 minutes in advance

Lanes are sized on the busiest 5 minutes, not the total for the shift. Before the survey, ask the guards to count vehicles through the bike-park gate in each 5 minutes of the peak, for a day or two. MSTAR engineers count again and time each pass in the lane.

During the survey

  • Stand at the gate and the bike park through the peak, timing each pass
  • Check the equipment in place against the device catalogue by brand and model
  • Locate the controllers, network and power for each lane
  • Agree the gate or lane to pilot, and the figures to measure

A measured pilot, with the criteria written down first

Rather than trust the figure in a brochure, try it on one gate or one vehicle lane of your own. Before installing, both sides write down the criteria: seconds per pass at peak time, vehicles or people per minute per lane, mismatched exits flagged. After the pilot, measure against exactly those criteria, then decide.

Products mentioned
All posts

Measure peak-hour flow at your site.

MSTAR SYSTEMS engineers survey the gate and bike park at peak time, then propose the number of lanes and the equipment.

Or call our hotline 1234567890

Used only to contact you about your request, never shared with third parties.